Archives

FAA Production Approval

This category contains 42 posts

FAA: Virtual Evaluation Is Here to Stay

The FAA plans to remain in a maximum telework environment. This means that they will be maximizing the use of remote technologies; but FAA personnel will also be permitted to perform onsite oversight where that is warranted. The FAA has stressed that there is no limitation or prohibition that would restrict the FAA from performing … Continue reading →

FAA Authorizes Remote Inspection/Testing for FAA Employees, Designees, and Manufacturers

FAA has issued remote inspections and testing guidance. The guidance applies to tasks performed by both FAA employees and designees. This guidance can also be used by PMA companies issuing 8130-3 tags. Continue reading →

FAA Plans for Continued Oversight During Covid-19 Crisis

FAA is taking steps to enable aviation to continue doing business during the Covid-19 Crisis Continue reading →

FAA-AIR Transformation Process Continues

The FAA is continuing to implement its AIR transformation, and will soon begin realigning the organization. This will be the first step of the transformation visible to industry. Continue reading →

Challenges Apparent in Reconciling Performance Based Regulations and Emerging Technologies

MARPA had the opportunity this week to attend the 2016 FAA-EASA International Aviation Safety Conference that was held in Washington, DC. The conference provides an opportunity for the regulatory agencies and industry to get together to discuss emerging issues in aviation safety and strengthen the cooperation between both the regulators themselves as well as the … Continue reading →

Compliance with the New Part 21 Rules

Part 21 has been amended in some ways that will impact the PMA community. MARPA is publishing compliance guides for members to facilitate compliance. members will receive the compliance guide with the next MARPA Supplement. Continue reading →

New Draft AC Could Affect Engine PMA Manufacturers

The FAA Engine and Propeller Directorate has issued a new draft Advisory Circular that could have a significant effect on companies seeking PMAs, STCs, or approval of repair or alteration of turbine engine and APU parts.  Draft AC 33-Geometry: Geometry and Dimensional Considerations for Comparative Test and Analysis for Turbine Engine and Auxiliary Power Unit … Continue reading →

New Requirements for PMA Holders include Enhanced Supplier Requirements

The FAA is proposing changes to the Part 21 manufacturing rules. A number of these will impact PMA holders. It will be important for the PMA community to provide comments to this NPRM. Continue reading →

FAA Engineering and Production to Merge!

Today’s Federal Register announced that the manufacturing policy-makers in the engineering division and the production division at FAA Headquarters will merge into a single unit. David Hempe, who leads AIR-100 today, will continue to lead the merged division. Continue reading →

Supply Chain Management Handbook

Are you using the Supply Chain Management Handbook (SCMH) as a tool to support your supplier control mechanisms? All PMA manufacturers have an obligation to control their suppliers in accordance with 14 C.F.R. 21.137. The FAA-approved quality manual will have a mechanism for accomplishing this but how do you improve your processes? The International Aerospace … Continue reading →